OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Mississippi — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Other project 264, Lauderdale County Other |
40.0 MW | Withdrawn / abandoned |
| Solar project 556, Marshall County Solar |
40.0 MW | Withdrawn / abandoned |
| Solar project 579, Noxubee County Solar |
39.0 MW | Withdrawn / abandoned |
| Solar project J3819, Madison County Solar |
36.1 MW | Withdrawn / abandoned |
| Solar project J381, Desoto County Solar |
25.0 MW | Withdrawn / abandoned |
| Other project 100, Oktibbeha County Other |
25.0 MW | Withdrawn / abandoned |
| Other project J3101, Sunflower County Other |
20.0 MW | Withdrawn / abandoned |
| Solar project IC-264, Clarke County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project 400, Lowndes County Solar |
20.0 MW | Withdrawn / abandoned |
| Solar project 349, Pontotoc County Solar |
17.0 MW | Withdrawn / abandoned |
| Other project 244, Pontotoc County Other |
16.0 MW | Withdrawn / abandoned |
| Other project 263, Pontotoc County Other |
15.0 MW | Withdrawn / abandoned |
| Solar project 275, Winston County Solar |
14.0 MW | Withdrawn / abandoned |
| Other project 157, Lowndes County Other |
12.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)