United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in CAISO (California) (2023 requests) β€” page 3

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown10753.4 GW
Active in queue53.4 GW107 requests
Agreement signed0.0 MW0 requests
Withdrawn486198.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

107 requests Β· page 3 of 3
ProjectCapacityStatusLocationRegionQueuedOnline
Bonita Bateria
Battery storage
103 MWIn study Orange, CACAISO Apr 2023target 2029
Cassia
Battery storage
102 MWIn study San Joaquin, CACAISO Apr 2023target 2031
Droga
Battery storage
102 MWIn study Merced, CACAISO Apr 2023target 2028
Off Stream Water Storage
Battery storage
68.9 MWIn study Colusa, CACAISO Apr 2023target 2030
Box
Solar
63.4 MWIn study Riverside, CACAISO Apr 2023target 2029
Little Hill
Battery storage
63.1 MWIn study San Bernardino, CACAISO Apr 2023target 2031
Separator Expansion
Battery storage
12.6 MWIn study San Bernardino, CACAISO Apr 2023target 2025
Page 3 of 3

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)