Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5213.7 GW
Active in queue13.7 GW52 requests
Agreement signed3,482 MW24 requests
Withdrawn241104.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

52 requests · page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project 659, Loudon County
Hydro
4.0 MWIn study Loudon, TNSoutheast Oct 2024target 2028
Hydro project 658, Loudon County
Hydro
3.0 MWIn study Loudon, TNSoutheast Oct 2024target 2028
Page 2 of 2

Capacity in the queue by state

Click a state to drill down.

By grid region

ISO/RTO markets and the non-ISO West and Southeast.

Requests by year joined

Capacity of requests in this view, by the year they entered the queue. Click a year.

20142025

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)