United States › EV charging › Virginia › Stanley
Shenandoah National Park - Big Meadows
Skyline Dr Milepost 51, Stanley, VA 22851
Station details
- Network
- Non-networked
- Level 2 ports
- 1
- Connectors
- J1772
- Hours
- 24 hours daily
- Location type
- Natl Park
- Open since
- August 2016
- Details last confirmed
- 13 January 2026
- AFDC station ID
- 77877
Location
38.51802, -78.43661
Nearby charging stations
- NERO: SHEN - 2Non-networked · 1 Level 20 mi
- Shenandoah National Park - Skyland Resort - Tesla DestinationTesla Destination · 2 Level 25.9 mi
- DuCard Vineyards - Tesla DestinationTesla Destination · 2 Level 27.2 mi
- WINCHESTER MED PAGE MEMORIAL 2ChargePoint · 2 Level 210.1 mi
- WINCHESTER MED PAGE MEMORIAL 1ChargePoint · 2 Level 210.1 mi
- Luray Visitor CenterNon-networked · 1 Level 210.2 mi
- Marlow FordFord Charge · 2 DC fast10.2 mi
- The Mimslyn Inn - Tesla DestinationTesla Destination · 2 Level 210.2 mi
- Creekside Commons Pocket ParkNon-networked · 1 Level 210.3 mi
- Off the Grid - Cafe, Market, Farm - Tesla DestinationTesla Destination · 3 Level 213.4 mi
Source: U.S. Department of Energy, Alternative Fuels Data Center station locator. Hours, prices and availability can change; check with Non-networked before you travel. Report a problem