Octary Global · France · Wind
GUILLEVILLE G3 G4 G5
Guilleville · Centre-Val de Loire · Operating
12.68
MW installed as reported
2018-12-21
Commissioning date, if provided

Engineering and capacity
- Technology
- Wind
- Detailed technology
- Terrestre
- Fuel
- Not supplied
- Installed power
- 12.681 MW
- Storage energy
- 0.000
- Voltage
- HTA
Location and responsible parties
- Commune
- Guilleville
- Department
- Eure-et-Loir
- Region
- Centre-Val de Loire
- Location accuracy
- Commune only; exact site not verified
- Owner
- Not verified
- Operator
- Not verified
- Network manager
- Enedis
Project timeline
- Commissioned
- 2018-12-21
- Connected
- 2018-12-21
- Disconnected
- Not reported
- Reported status
- Operating
Connection and disconnection dates do not independently establish complete station construction or decommissioning history.
Technology graphics
Technology illustrations are reusable from Octary's UK atlas and are schematic, not photographs of this particular plant.

Source record
- EIC identifier
- 17W0000005037083
- Source family
- fr-rte-register