Octary Global · France · Wind
Parc Eolien
Fontaine-la-Guyon · Centre-Val de Loire · Operating
13.20
MW installed as reported
2020-02-18
Commissioning date, if provided

Engineering and capacity
- Technology
- Wind
- Detailed technology
- Not supplied
- Fuel
- Not supplied
- Installed power
- 13.200 MW
- Storage energy
- Not supplied; source units must be checked
- Voltage
- HTA
Location and responsible parties
- Commune
- Fontaine-la-Guyon
- Department
- Eure-et-Loir
- Region
- Centre-Val de Loire
- Location accuracy
- Commune only; exact site not verified
- Owner
- Not verified
- Operator
- Not verified
- Network manager
- Synelva
Project timeline
- Commissioned
- 2020-02-18
- Connected
- 2020-02-18
- Disconnected
- Not reported
- Reported status
- Operating
Connection and disconnection dates do not independently establish complete station construction or decommissioning history.
Technology graphics
Technology illustrations are reusable from Octary's UK atlas and are schematic, not photographs of this particular plant.

Source record
- EIC identifier
- 17W000002169104I
- Source family
- fr-rte-register