β France power stations atlas
Octary Global Β· France Β· Bioenergy
NOVILTA1 - ADP A1 DE LA CENTRALE THERMIQUE DE NOVILLARS
Novillars Β· Bourgogne-Franche-ComtΓ© Β· Operating
20.00
MW installed as reported
2018-08-31
Commissioning date, if provided

Engineering and capacity
- Technology
- Bioenergy
- Detailed technology
- Autre
- Fuel
- Bois
- Installed power
- 20.000 MW
- Storage energy
- Not supplied; source units must be checked
- Voltage
- 63 kV
Location and responsible parties
- Commune
- Novillars
- Department
- Doubs
- Region
- Bourgogne-Franche-ComtΓ©
- Location accuracy
- Commune only; exact site not verified
- Owner
- Not verified
- Operator
- Not verified
- Network manager
- RTE
Project timeline
- Commissioned
- 2018-08-31
- Connected
- 2018-08-31
- Disconnected
- Not reported
- Reported status
- Operating
Connection and disconnection dates do not independently establish complete station construction or decommissioning history.
Technology graphics
Technology illustrations are reusable from Octary's UK atlas and are schematic, not photographs of this particular plant.
Source record
- EIC identifier
- 17W000000476725R
- Source family
- fr-rte-register