WIND Β· OPERATIONAL

Pearie Law

Pearie Law is a 19.2 MW onshore wind farm in Scotland, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningApr 2012 (completed)
  2. ConsentedJul 2014 (completed)
  3. ConstructionSep 2015 (completed)
  4. OperatingDec 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
19.2 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
EDF Energy
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
EH55 8RT
Coordinates
55.8205, -3.5624

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Pearie Law compares

233rd of 488largest wind farms in the UK register
136th of 199in Scotland
0.07%of listed UK wind farms capacity
β‰ˆ 44 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 19.2 MW station would generate roughly 44 GWh of electricity in a year, similar to the annual use of about 16,200 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by EDF Energy

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Pearie Law Wind Farm
Developer / operator
EDF Energy Renewables
Planning authority
West Lothian
Planning reference
0267/FUL/12
Application submitted
17 April 2012
Permission granted
8 July 2014
Construction started
15 September 2015
Began operating
1 December 2016
Capacity in planning record
19.2 MW
Address
Pearie Law, West Calder, West Lothian, EH55, Lothian
REPD reference
4211

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source