π Project Overview
Yorkshire Building Society, Plover Road - Solar Panels is a 0.17 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Briar Consulting Engineers Limited. Planning permission has been granted as of July 2023 and it is awaiting construction. The determining authority is Kirklees, reference 2023/CLASS J/91554/W.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Briar Consulting Engineers Limited |
| Owner / operator | Briar Consulting Engineers Limited |
| Year consented | 2023 |
| Location | Yorkshire Building Society, 42 Plover Road, Oakes, Huddersfield, West Yorkshire, HD3 3HR |
| Region | Yorkshire and Humber |
| Coordinates | 53.6543827Β°N, 1.8257387Β°W |