York House School, Sarratt Road - Solar Panels is a 0.28 MW solar farm project in Eastern. The applicant or operator on record is Solar Options for Schools Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Three Rivers, reference 25…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2026-01-13.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.280 MW
Registered Capacity

πŸ“‹ Project Overview

York House School, Sarratt Road - Solar Panels is a 0.28 MW solar farm project in Eastern. The applicant or operator on record is Solar Options for Schools Limited. The application has been withdrawn or the scheme abandoned. The determining authority is Three Rivers, reference 25/1218/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.28 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.280 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSolar Options for Schools Limited
Owner / operatorSolar Options for Schools Limited
LocationYork House School, Sarratt Road, Rickmansworth, Hertfordshire, WD3 4LW
RegionEastern
Coordinates51.6627329Β°N, 0.459427Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)40000