York College, Sim Balk Lane, York, North Yorkshire, YO23 2BB
York College - Solar Panels is a 0.28 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is York College. Planning permission has been granted as of May 2025 and it is awaiting construction. The determining authority is York, reference 25/00489/SOLβ¦
Consented / Approved
Project stageConsented
PlanningMar 2025 (completed)
ConsentedMay 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-06-02.
Registered planning capacity; not measured generation.
York College - Solar Panels is a 0.28 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is York College. Planning permission has been granted as of May 2025 and it is awaiting construction. The determining authority is York, reference 25/00489/SOLAR.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.280 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
York College
Owner / operator
York College
Year consented
2025
Location
York College, Sim Balk Lane, York, North Yorkshire, YO23 2BB