Ymca And Castlefield Hotel, Liverpool Road - Solar Panels is a 0.2 MW solar farm project in North West. The applicant or operator on record is Manchester YMCA & Castlefield Hotel. The application has been withdrawn or the scheme abandoned. The determining authority is Manchester,β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2023 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2024-02-14.
Registered planning capacity; not measured generation.
Ymca And Castlefield Hotel, Liverpool Road - Solar Panels is a 0.2 MW solar farm project in North West. The applicant or operator on record is Manchester YMCA & Castlefield Hotel. The application has been withdrawn or the scheme abandoned. The determining authority is Manchester, reference 138882/P14J/2023.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.