Yate Leisure Centre, Kennedy Way, Yate, Bristol, Gloucestershire, BS37 4DQ
Yate Leisure Centre, Kennedy Way - Solar Panels is a 0.37 MW solar farm project in South West. The applicant or operator on record is Ineco Energy. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is South Gloucesterβ¦
Consented / Approved
Project stageConsented
PlanningMar 2024 (completed)
ConsentedApr 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2024-05-13.
Registered planning capacity; not measured generation.
Yate Leisure Centre, Kennedy Way - Solar Panels is a 0.37 MW solar farm project in South West. The applicant or operator on record is Ineco Energy. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is South Gloucestershire, reference P24/00566/PNRE.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.370 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ineco Energy
Owner / operator
Ineco Energy
Year consented
2024