Wull Muir Wind Farm is a 36 MW onshore wind project in Scotland. The applicant or operator on record is Energiekontor UK Limited. The planning application was refused. The determining authority is Scottish Borders, reference 22/01960/FUL.…

Refused
Project stageRefused
  1. PlanningDec 2022 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2024-08-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

36.000 MW
Registered Capacity

πŸ“‹ Project Overview

Wull Muir Wind Farm is a 36 MW onshore wind project in Scotland. The applicant or operator on record is Energiekontor UK Limited. The planning application was refused. The determining authority is Scottish Borders, reference 22/01960/FUL.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)36.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEnergiekontor UK Limited
Owner / operatorEnergiekontor UK Limited
LocationNorth Of Carcant Lodge Wull Muir Wind Farm Heriot, Lothian, EH38 5YE
RegionScotland
Coordinates55.7645699Β°N, 2.9674597Β°W

Additional published register fields

Registered technologyWind Onshore
Storage Co-location REPD Ref ID13095
Turbine Capacity (MW)4.5
No. of Turbines8
Height of Turbines (m)150
Are they re-applying (Old REPD Ref) 7429 & 7430

πŸ“… Project Timeline

2022-12-16