Milestones Museum Basingstoke Leisure Park, Worting Road, Basingstoke, Hampshire, RG22 6PG
Worting Road - Solar Panels is a 0.18 MW solar farm project in South East. The applicant or operator on record is Solar Voltaics Limited. Planning permission has been granted as of November 2021 and it is awaiting construction. The determining authority is Basingstoke and Deane, β¦
Consented / Approved
Project stageConsented
PlanningSep 2021 (completed)
ConsentedNov 2021 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2021-11-09.
Registered planning capacity; not measured generation.
Worting Road - Solar Panels is a 0.18 MW solar farm project in South East. The applicant or operator on record is Solar Voltaics Limited. Planning permission has been granted as of November 2021 and it is awaiting construction. The determining authority is Basingstoke and Deane, reference 21/03052/GPDSP.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.180 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Solar Voltaics Limited
Owner / operator
Solar Voltaics Limited
Year consented
2021
Location
Milestones Museum Basingstoke Leisure Park, Worting Road, Basingstoke, Hampshire, RG22 6PG