Edmunds Road, Worsbrough, Barnsley, South Yorkshire, S70 5PG
Worsbrough Waste Water Treatment Works - Solar Panels is a 0.7 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Downing Energy Development Company Limited. The scheme is currently in the planning system, submitted May 2023. The determining autβ¦
In Planning
Project stageIn planning
PlanningMay 2023 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2023-06-13.
Registered planning capacity; not measured generation.
Worsbrough Waste Water Treatment Works - Solar Panels is a 0.7 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Downing Energy Development Company Limited. The scheme is currently in the planning system, submitted May 2023. The determining authority is Barnsley, reference 2023/0516.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.700 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Downing Energy Development Company Limited
Owner / operator
Downing Energy Development Company Limited
Location
Edmunds Road, Worsbrough, Barnsley, South Yorkshire, S70 5PG