Worminster Down Cross Farm North Wootton, Somerset, BA4 4HB
Worminster Down is a 15 MW solar farm project in South West. The applicant or operator on record is Good Energy Generation. The planning application was refused. The determining authority is Somerset, reference 2014/0962/FUL.β¦
Refused
Project stageRefused
PlanningJun 2014 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Appeal Refused.
Official register: July 2026
Recorded status: Appeal Refused. Source record updated 2015-10-05.
Registered planning capacity; not measured generation.
Worminster Down is a 15 MW solar farm project in South West. The applicant or operator on record is Good Energy Generation. The planning application was refused. The determining authority is Somerset, reference 2014/0962/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
15.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Good Energy Generation
Owner / operator
Good Energy Generation
Location
Worminster Down Cross Farm North Wootton, Somerset, BA4 4HB