πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Woodside Leisure Centre - Solar PV Panels

Woodside Leisure Centre, Horseshoe Lane, Watford, Hertfordshire, WD25 7HH

Woodside Leisure Centre - Solar PV Panels is a 0.29 MW solar farm project in Eastern. The applicant or operator on record is Watford Borough Council. It is recorded as operational since March 2025. The determining authority is Watford, reference 24/00987/JJPD.…

Operational Β· Since 2025
Project stageOperating
  1. PlanningDec 2024 (completed)
  2. ConsentedJan 2025 (completed)
  3. Construction (completed)
  4. OperatingMar 2025 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2025-03-24.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.290 MW
Registered Capacity
2025
Commissioned

πŸ“‹ Project Overview

Woodside Leisure Centre - Solar PV Panels is a 0.29 MW solar farm project in Eastern. The applicant or operator on record is Watford Borough Council. It is recorded as operational since March 2025. The determining authority is Watford, reference 24/00987/JJPD.

Site Schematic

SUBSTATION ? ha Β· 0.29 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.290 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWatford Borough Council
Owner / operatorWatford Borough Council
Year consented2025
Commissioned / target2025
LocationWoodside Leisure Centre, Horseshoe Lane, Watford, Hertfordshire, WD25 7HH
RegionEastern
Coordinates51.6949492Β°N, 0.3928457Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2024-12-05
2025-01-30
2025-03-01