Solar Farm

Woodchurch High School, Carr Bridge Road - Solar Panels

Woodchurch High School Carr Bridge Road, Woodchurch, Merseyside, CH49 7NG

Woodchurch High School, Carr Bridge Road - Solar Panels is a 0.49 MW solar farm project in North West. The applicant or operator on record is Located Property Limited. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining author…

Consented / Approved
Project stageConsented
  1. PlanningSep 2025 (completed)
  2. ConsentedNov 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-01-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.490 MW
Registered Capacity

πŸ“‹ Project Overview

Woodchurch High School, Carr Bridge Road - Solar Panels is a 0.49 MW solar farm project in North West. The applicant or operator on record is Located Property Limited. Planning permission has been granted as of November 2025 and it is awaiting construction. The determining authority is Wirral, reference SPVX/25/01466.

Site Schematic

SUBSTATION ? ha Β· 0.49 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.490 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLocated Property Limited
Owner / operatorLocated Property Limited
Year consented2025
LocationWoodchurch High School Carr Bridge Road, Woodchurch, Merseyside, CH49 7NG
RegionNorth West
Coordinates53.3747348Β°N, 3.0774655Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2025-09-19
2025-11-12