Wood Lodge Farm, Huntingdon Road - Solar Farm is a 8.8 MW battery storage project in East Midlands. The applicant or operator on record is Unknown. The planning application was refused. The determining authority is North Northamptonshire, reference NE/23/00858/FUL.β¦
Refused
Project stageRefused
PlanningSep 2023 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2024-10-15.
Registered planning capacity; not measured generation.
Wood Lodge Farm, Huntingdon Road - Solar Farm is a 8.8 MW battery storage project in East Midlands. The applicant or operator on record is Unknown. The planning application was refused. The determining authority is North Northamptonshire, reference NE/23/00858/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.