Wood Lodge Farm, Huntingdon Road - Solar Farm

S/O Wood Lodge Farm, Huntingdon Road, Thrapston, Kettering, Northamptonshire, NN14 4NJ

Wood Lodge Farm, Huntingdon Road - Solar Farm is a 49.99 MW solar farm project in East Midlands. The applicant or operator on record is Unknown. The scheme is currently in the planning system, submitted September 2023. The determining authority is North Northamptonshire, referenc…

In Planning
Project stageIn planning
  1. PlanningSep 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2023-09-28.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.990 MW
Registered Capacity

πŸ“‹ Project Overview

Wood Lodge Farm, Huntingdon Road - Solar Farm is a 49.99 MW solar farm project in East Midlands. The applicant or operator on record is Unknown. The scheme is currently in the planning system, submitted September 2023. The determining authority is North Northamptonshire, reference NE/23/00858/FUL.

Site Schematic

SUBSTATION ? ha Β· 49.99 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.990 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperUnknown
Owner / operatorUnknown
LocationS/O Wood Lodge Farm, Huntingdon Road, Thrapston, Kettering, Northamptonshire, NN14 4NJ
RegionEast Midlands
Coordinates52.3871415Β°N, 0.4833831Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID14908
Mounting Type for SolarGround
Solar Site Area (sqm)660000

πŸ“… Project Timeline

2023-09-12