Wood Farm, Swindon Road - Solar Panels is a 0.18 MW solar farm project in South West. The applicant or operator on record is Berkeley Farm Dairy. Planning permission has been granted as of May 2023 and it is awaiting construction. The determining authority is Swindon, reference S…

Consented / Approved
Project stageConsented
  1. PlanningApr 2023 (completed)
  2. ConsentedMay 2023 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2023-06-13.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.180 MW
Registered Capacity

πŸ“‹ Project Overview

Wood Farm, Swindon Road - Solar Panels is a 0.18 MW solar farm project in South West. The applicant or operator on record is Berkeley Farm Dairy. Planning permission has been granted as of May 2023 and it is awaiting construction. The determining authority is Swindon, reference S/PSOLP/23/0451.

Site Schematic

SUBSTATION ? ha Β· 0.18 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.180 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBerkeley Farm Dairy
Owner / operatorBerkeley Farm Dairy
Year consented2023
LocationWood Farm Swindon Road Wroughton, Wiltshire, SN4 9BZ
RegionSouth West
Coordinates51.5277807Β°N, 1.7769238Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID
CfD Capacity (MW)
Turbine Capacity (MW)
No. of Turbines
Height of Turbines (m)
Mounting Type for SolarRoof
Are they re-applying (Old REPD Ref)
Solar Site Area (sqm)

πŸ“… Project Timeline

2023-04-05
2023-05-31