πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Wood Farm Solar Park (linked site)

Opp. Kingston Lane, Manor Farm, Deeside Lane, Sealand, Chester, Flintshire, CH1 6BP

Wood Farm Solar Park (linked site) is a 5 MW solar farm project in Wales. The applicant or operator on record is SEP Solar. The planning application was refused. The determining authority is Flintshire, reference 53687.…

Refused
Project stageRefused
  1. PlanningMay 2015 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Refused.

Official register: July 2026

Recorded status: Appeal Refused. Source record updated 2016-12-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Wood Farm Solar Park (linked site) is a 5 MW solar farm project in Wales. The applicant or operator on record is SEP Solar. The planning application was refused. The determining authority is Flintshire, reference 53687.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSEP Solar
Owner / operatorSEP Solar
LocationOpp. Kingston Lane, Manor Farm, Deeside Lane, Sealand, Chester, Flintshire, CH1 6BP
RegionWales
Coordinates53.2002342Β°N, 2.9622869Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)103000

πŸ“… Project Timeline

2015-05-11