Land To The South Of Wold Road, Burton Latimer, Wellingborough, Northamptonshire,, Northamptonshire, NN9 5HW
Wold Road (land south of) Peak Power Generation Plant is a battery storage project in East Midlands. The applicant or operator on record is First Renewable Developments. The planning permission has expired. The determining authority is North Northamptonshire, reference KET/2015/0β¦
Expired
Project stageConsent lapsed
PlanningSep 2015 (completed)
Consented (completed)
Consent lapsed (project stopped here)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Expired.
Official register: July 2026
Recorded status: Planning Permission Expired. Source record updated 2020-05-27.
Registered planning capacity; not measured generation.
Wold Road (land south of) Peak Power Generation Plant is a battery storage project in East Midlands. The applicant or operator on record is First Renewable Developments. The planning permission has expired. The determining authority is North Northamptonshire, reference KET/2015/0751.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Battery chemistry
Co-located with RE
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
First Renewable Developments
Owner / operator
First Renewable Developments
Location
Land To The South Of Wold Road, Burton Latimer, Wellingborough, Northamptonshire,, Northamptonshire, NN9 5HW