π Project Overview
Wold Road (land south of) Peak Power Generation Plant is a battery storage project in East Midlands. The applicant or operator on record is First Renewable Developments. The planning permission has expired. The determining authority is North Northamptonshire, reference KET/2015/0751.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Battery chemistry | Co-located with RE |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | First Renewable Developments |
| Owner / operator | First Renewable Developments |
| Location | Land To The South Of Wold Road, Burton Latimer, Wellingborough, Northamptonshire,, Northamptonshire, NN9 5HWΒ |
| Region | East Midlands |
| Coordinates | 52.3631876Β°N, 0.6452987Β°W |