π Project Overview
Withybush Road, Withybush Industrial Estate - Micro Energy Storage System is a 0.2 MW battery storage project in Wales. The applicant or operator on record is AMP Clean Energy. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authority is Pembrokeshire, reference 25/0349/PA.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | AMP Clean Energy |
| Owner / operator | AMP Clean Energy |
| Year consented | 2025 |
| Location | S/O Withybush Road, Withybush Industrial Estate, Haverfordwest, Dyfed, SA62 4BW |
| Region | Wales |
| Coordinates | 51.82758Β°N, 4.9583853Β°W |