Withy Place Bramley Road Silchester, Berkshire, RG7 2LN
Withy Place, Bramley Road - Battery Energy Storage is a 50 MW battery storage project in South East. The applicant or operator on record is Root Power South Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority isβ¦
Consented / Approved
Project stageConsented
PlanningSep 2024 (completed)
ConsentedJul 2025 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2025-07-28.
Registered planning capacity; not measured generation.
Withy Place, Bramley Road - Battery Energy Storage is a 50 MW battery storage project in South East. The applicant or operator on record is Root Power South Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority is Basingstoke and Deane, reference 24/01913/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
50.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Root Power South Limited
Owner / operator
Root Power South Limited
Year consented
2025