π Project Overview
Wilton Engineering Services, Port Clarence Offshore Base - Solar Panels is a 1.2 MW solar farm project in North East. The applicant or operator on record is Port Clarence Logistics Limited. Planning permission has been granted as of September 2025 and it is awaiting construction. The determining authority is Stockton-on-Tees, reference 25/1877/PRPVND.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 1.200 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Port Clarence Logistics Limited |
| Owner / operator | Port Clarence Logistics Limited |
| Year consented | 2025 |
| Location | Wilton Engineering Services Limited, Port Clarence Offshore Base, Port Clarence Road, County Durham, TS2 1RZ |
| Region | North East |
| Coordinates | 54.5866065Β°N, 1.2287275Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Roof |