Bioenergy / Waste

Willowbrook

Willowbrook East Industrial Estate, Shelton Road, Corby,, Northamptonshire

Willowbrook is a 3 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Clean Power Properties. The application has been withdrawn or the scheme abandoned. The determining authority is North Northamptonshire, reference 13/00079/WASFUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedFeb 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2015-09-28.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.000 MW
Registered Capacity

πŸ“‹ Project Overview

Willowbrook is a 3 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Clean Power Properties. The application has been withdrawn or the scheme abandoned. The determining authority is North Northamptonshire, reference 13/00079/WASFUL.

πŸ”§ Technical Specifications

Capacity (MW)3.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperClean Power Properties
Owner / operatorClean Power Properties
Year consented2014
LocationWillowbrook East Industrial Estate, Shelton Road, Corby,, Northamptonshire
RegionEast Midlands
Coordinates52.5080047Β°N, 0.6614936Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2013-09-16
2014-02-07