Willow Hall Farm Willow Hall Lane Thorney Peterborough, Cambridgeshire
Willow Hall Farm is a 10 MW onshore wind project in Eastern. The applicant or operator on record is REG Windpower. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference 14/01136/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningJun 2014 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2015-12-02.
Registered planning capacity; not measured generation.
Willow Hall Farm is a 10 MW onshore wind project in Eastern. The applicant or operator on record is REG Windpower. The application has been withdrawn or the scheme abandoned. The determining authority is Peterborough, reference 14/01136/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
10.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
REG Windpower
Owner / operator
REG Windpower
Location
Willow Hall Farm Willow Hall Lane Thorney Peterborough, Cambridgeshire