π Project Overview
Wigan Investment Centre - Solar panels is a 0.2 MW solar farm project in North West. The applicant or operator on record is Cactus Energy. Planning permission has been granted as of August 2021 and it is awaiting construction. The determining authority is Wigan, reference A/21/91900/14PDJ.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Cactus Energy |
| Owner / operator | Cactus Energy |
| Year consented | 2021 |
| Location | Wigan Investment Centre, Waterside Drive, Wigan, Greater Manchester, WN3 5BA |
| Region | North West |
| Coordinates | 53.5397727Β°N, 2.6357356Β°W |