π Project Overview
Wienerberger Limited, Tongue Lane - Solar Panels is a 4.7 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Wienerberger Limited. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshire, reference 25/00699/PLF.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 4.700 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Wienerberger Limited |
| Owner / operator | Wienerberger Limited |
| Location | Wienerberger Limited, Tongue Lane, Blacktoft, Brough, East Riding of Yorkshire, HU15 2GS |
| Region | Yorkshire and Humber |
| Coordinates | 53.736646Β°N, 0.6979414Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Ground |
| Solar Site Area (sqm) | 45000 |