Whitmore Way - Micro Energy Storage Project is a 0.2 MW battery storage project in Eastern. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Basildon, reference 25/00166/FULL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningFeb 2025 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-12-09.
Registered planning capacity; not measured generation.
Whitmore Way - Micro Energy Storage Project is a 0.2 MW battery storage project in Eastern. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Basildon, reference 25/00166/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.