πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Whitestones, Cuminestown - Solar Farm

Whitestones, Cuminestown, Turriff, Aberdeenshire, AB53 5ZB

Whitestones, Cuminestown - Solar Farm is a 9.9 MW solar farm project in Scotland. The applicant or operator on record is Locogen Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority is Aberdeenshire, reference AP…

Consented / Approved
Project stageConsented
  1. PlanningApr 2025 (completed)
  2. ConsentedJul 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-02-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.900 MW
Registered Capacity

πŸ“‹ Project Overview

Whitestones, Cuminestown - Solar Farm is a 9.9 MW solar farm project in Scotland. The applicant or operator on record is Locogen Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority is Aberdeenshire, reference APP/2025/0338.

Site Schematic

SUBSTATION ? ha Β· 9.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)9.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperLocogen Limited
Owner / operatorLocogen Limited
Year consented2025
LocationWhitestones, Cuminestown, Turriff, Aberdeenshire, AB53 5ZB
RegionScotland
Coordinates57.5443713Β°N, 2.3227565Β°W

Additional published register fields

Registered technologySolar Photovoltaics
CfD Allocation RoundAR7a
CfD Capacity (MW)9.9
Mounting Type for SolarGround
Solar Site Area (sqm)15100

πŸ“… Project Timeline

2025-04-07
2025-07-22