Bioenergy / Waste

Whisby Landfill Gas Project

Thorpe Road/Eagle Road, Whisby, Lincolnshire, Lincolnshire

Whisby Landfill Gas Project is a 1.3 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Waste Recycling Group. The application has been withdrawn or the scheme abandoned. The determining authority is North Kesteven.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedOct 2000 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2014-04-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.300 MW
Registered Capacity

πŸ“‹ Project Overview

Whisby Landfill Gas Project is a 1.3 MW bioenergy / waste project in East Midlands. The applicant or operator on record is Waste Recycling Group. The application has been withdrawn or the scheme abandoned. The determining authority is North Kesteven.

πŸ”§ Technical Specifications

Capacity (MW)1.300 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWaste Recycling Group
Owner / operatorWaste Recycling Group
Year consented2000
LocationThorpe Road/Eagle Road, Whisby, Lincolnshire, Lincolnshire
RegionEast Midlands
Coordinates53.1878183Β°N, 0.6395681Β°W

Additional published register fields

Registered technologyLandfill Gas

πŸ“… Project Timeline

2000-08-17
2000-10-24