Solar Farm

Wharrels Hill

E/O Wharrels Hill Wind Farm, Adjacent A591, Bothel, Cockermouth, Cumbria, Cumbria

Wharrels Hill is a 14.6 MW solar farm project in North West. The applicant or operator on record is Green Switch Solutions. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2014/0636.…

Withdrawn
15 MW
Installed Capacity

πŸ“‹ Project Overview

Wharrels Hill is a 14.6 MW solar farm project in North West. The applicant or operator on record is Green Switch Solutions. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2014/0636.

Site Schematic

SUBSTATION ? ha Β· 14.6 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)15 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Switch Solutions
Owner / operatorGreen Switch Solutions
LocationE/O Wharrels Hill Wind Farm, Adjacent A591, Bothel, Cockermouth, Cumbria, Cumbria
RegionNorth West
Coordinates54.731656Β°N, 3.2745725Β°W

πŸ“… Project Timeline