π Project Overview
Wharrels Hill is a 14.6 MW solar farm project in North West. The applicant or operator on record is Green Switch Solutions. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2014/0636.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 14.600 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Green Switch Solutions |
| Owner / operator | Green Switch Solutions |
| Location | E/O Wharrels Hill Wind Farm, Adjacent A591, Bothel, Cockermouth, Cumbria, Cumbria |
| Region | North West |
| Coordinates | 54.731656Β°N, 3.2745724Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Ground |
| Solar Site Area (sqm) | 277000 |