Wharrels Hill is a 14.6 MW solar farm project in North West. The applicant or operator on record is Green Switch Solutions. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2014/0636.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Withdrawn.

Official register: July 2026

Recorded status: Appeal Withdrawn. Source record updated 2018-08-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

14.600 MW
Registered Capacity

πŸ“‹ Project Overview

Wharrels Hill is a 14.6 MW solar farm project in North West. The applicant or operator on record is Green Switch Solutions. The application has been withdrawn or the scheme abandoned. The determining authority is Cumberland, reference 2/2014/0636.

Site Schematic

SUBSTATION ? ha Β· 14.6 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)14.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGreen Switch Solutions
Owner / operatorGreen Switch Solutions
LocationE/O Wharrels Hill Wind Farm, Adjacent A591, Bothel, Cockermouth, Cumbria, Cumbria
RegionNorth West
Coordinates54.731656Β°N, 3.2745724Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)277000

πŸ“… Project Timeline

2014-08-22