Solar Farm

West Holcombe

Land at NGR 299298 125070 (East Of Bowdens Lane) Shillingford Devon, Devon

West Holcombe is a 5.5 MW solar farm project in South West. The applicant or operator on record is Wessex Solar Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Mid Devon, reference 14/00903/MFUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2014-09-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.500 MW
Registered Capacity

πŸ“‹ Project Overview

West Holcombe is a 5.5 MW solar farm project in South West. The applicant or operator on record is Wessex Solar Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Mid Devon, reference 14/00903/MFUL.

Site Schematic

SUBSTATION ? ha Β· 5.5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWessex Solar Energy
Owner / operatorWessex Solar Energy
LocationLand at NGR 299298 125070 (East Of Bowdens Lane) Shillingford Devon, Devon
RegionSouth West
Coordinates51.0192412Β°N, 3.4481876Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)133400

πŸ“… Project Timeline

2014-06-16