Land To The North Of, West Grange, West Grange Farm, Brankstone , Blairhall, Dunfermline,, Fife, KY12
West Grange Solar Farm is a 5 MW solar farm project in Scotland. The applicant or operator on record is West Strathore Solar. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 16/02840/FULL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2016 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedDec 2016 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2019-11-27.
Registered planning capacity; not measured generation.
West Grange Solar Farm is a 5 MW solar farm project in Scotland. The applicant or operator on record is West Strathore Solar. The application has been withdrawn or the scheme abandoned. The determining authority is Fife, reference 16/02840/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
West Strathore Solar
Owner / operator
West Strathore Solar
Year consented
2016
Location
Land To The North Of, West Grange, West Grange Farm, Brankstone , Blairhall, Dunfermline,, Fife, KY12