Solar Farm

Weinerberger House, Brooks Drive - Solar Panels

Weinerberger House, Brooks Drive, Cheadle Royal Business Park, Cheadle, Cheshire, SK8 3SA

Weinerberger House, Brooks Drive - Solar Panels is a 0.13 MW solar farm project in North West. The applicant or operator on record is Wienerberger Limited Head Office. The scheme is currently in the planning system, submitted September 2024. The determining authority is Stockport…

In Planning
Project stageIn planning
  1. PlanningSep 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2024-11-05.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.130 MW
Registered Capacity

πŸ“‹ Project Overview

Weinerberger House, Brooks Drive - Solar Panels is a 0.13 MW solar farm project in North West. The applicant or operator on record is Wienerberger Limited Head Office. The scheme is currently in the planning system, submitted September 2024. The determining authority is Stockport, reference DC/093396.

Site Schematic

SUBSTATION ? ha Β· 0.13 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.130 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWienerberger Limited Head Office
Owner / operatorWienerberger Limited Head Office
LocationWeinerberger House, Brooks Drive, Cheadle Royal Business Park, Cheadle, Cheshire, SK8 3SA
RegionNorth West
Coordinates53.3773699Β°N, 2.2221757Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2024-09-17