Land At Waye Barton, Littlehempston, Totnes, Devon, TQ9 6NQ
Waye Barton is a 5 MW solar farm project in South West. The applicant or operator on record is Lark Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Teignbridge, reference 15/02090/MAJ.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningAug 2015 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2015-10-06.
Registered planning capacity; not measured generation.
Waye Barton is a 5 MW solar farm project in South West. The applicant or operator on record is Lark Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Teignbridge, reference 15/02090/MAJ.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Lark Energy
Owner / operator
Lark Energy
Location
Land At Waye Barton, Littlehempston, Totnes, Devon, TQ9 6NQ