E/O Watling Street, Adj Horse And Jockey Public House, Caddington, Dunstable, Bedfordshire, LU6
Watling Street, Caddington - Solar Farm is a 19.69 MW solar farm project in Eastern. The applicant or operator on record is Chiltern Renewables Hockliffe Limited. The scheme is currently in the planning system, submitted November 2023. The determining authority is Central Bedfordβ¦
Revised
Project stageSuperseded by a new application
PlanningNov 2023 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2024-08-16.
Registered planning capacity; not measured generation.
Watling Street, Caddington - Solar Farm is a 19.69 MW solar farm project in Eastern. The applicant or operator on record is Chiltern Renewables Hockliffe Limited. The scheme is currently in the planning system, submitted November 2023. The determining authority is Central Bedfordshire, reference CB/23/03583/OUT.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
19.690 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Chiltern Renewables Hockliffe Limited
Owner / operator
Chiltern Renewables Hockliffe Limited
Location
E/O Watling Street, Adj Horse And Jockey Public House, Caddington, Dunstable, Bedfordshire, LU6