south of Watford, and north-west of the village of Long Buckby, and to the east of the M1 motorway, Northamptonshire
Watford Gap Wind Farm is a 10 MW onshore wind project in East Midlands. The applicant or operator on record is Gamesa Energy. The planning application was refused. The determining authority is West Northamptonshire, reference DA/2011/0850.β¦
Refused
Project stageRefused
PlanningOct 2011 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2014-06-06.
Registered planning capacity; not measured generation.
Watford Gap Wind Farm is a 10 MW onshore wind project in East Midlands. The applicant or operator on record is Gamesa Energy. The planning application was refused. The determining authority is West Northamptonshire, reference DA/2011/0850.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
10.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Gamesa Energy
Owner / operator
Gamesa Energy
Location
south of Watford, and north-west of the village of Long Buckby, and to the east of the M1 motorway, Northamptonshire