πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Waste Processing Plant, Manston Road North - Solar Farm

Sw/O Waste Processing Plant, Manston Road North, Manston, Ramsgate, Kent, CT12 5BS

Waste Processing Plant, Manston Road North - Solar Farm is a 2.7 MW solar farm project in South East. The applicant or operator on record is Speciality Breads Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority …

Consented / Approved
3 MW
Installed Capacity

πŸ“‹ Project Overview

Waste Processing Plant, Manston Road North - Solar Farm is a 2.7 MW solar farm project in South East. The applicant or operator on record is Speciality Breads Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority is Thanet, reference F/TH/25/0162.

Site Schematic

SUBSTATION ? ha Β· 2.7 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)3 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSpeciality Breads Limited
Owner / operatorSpeciality Breads Limited
Year consented2025
LocationSw/O Waste Processing Plant, Manston Road North, Manston, Ramsgate, Kent, CT12 5BS
RegionSouth East
Coordinates51.3513291Β°N, 1.3484238Β°E

πŸ“… Project Timeline