Washpit Drove is a 4.7 MW onshore wind project in Eastern. The applicant or operator on record is Airvolution Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Breckland, reference 3PL/2014/0106/F.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningFeb 2014 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2015-11-05.
Registered planning capacity; not measured generation.
Washpit Drove is a 4.7 MW onshore wind project in Eastern. The applicant or operator on record is Airvolution Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Breckland, reference 3PL/2014/0106/F.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.