Solar Farm

Washdyke Farm, Billingborough Road - Solar farm

Washdyke Farm, Billingborough Road, Folkingham, Sleaford, Lincolnshire, NG34 0EZ

Washdyke Farm, Billingborough Road - Solar farm is a 27 MW solar farm project in East Midlands. The applicant or operator on record is GS Ignis Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is South Keste…

Consented / Approved
Project stageConsented
  1. PlanningMar 2023 (completed)
  2. ConsentedApr 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Appeal Granted.

Official register: July 2026

Recorded status: Appeal Granted. Source record updated 2026-02-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

27.000 MW
Registered Capacity

πŸ“‹ Project Overview

Washdyke Farm, Billingborough Road - Solar farm is a 27 MW solar farm project in East Midlands. The applicant or operator on record is GS Ignis Limited. Planning permission has been granted as of April 2024 and it is awaiting construction. The determining authority is South Kesteven, reference S23/0511.

Site Schematic

SUBSTATION ? ha Β· 27 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)27.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperGS Ignis Limited
Owner / operatorGS Ignis Limited
Year consented2024
LocationWashdyke Farm, Billingborough Road, Folkingham, Sleaford, Lincolnshire, NG34 0EZ
RegionEast Midlands
Coordinates52.8913993Β°N, 0.3921873Β°W

Additional published register fields

Registered technologySolar Photovoltaics
CfD Allocation RoundAR7a
CfD Capacity (MW)24.75
Mounting Type for SolarGround
Solar Site Area (sqm)260000

πŸ“… Project Timeline

2023-03-27
2024-04-23