Bioenergy / Waste

Warwick International Biomass CHP

Coast Rd, Holywell, Mostyn, Clwyd, CH8 9HE

Warwick International Biomass CHP is a 8.5 MW bioenergy / waste project in Wales. The applicant or operator on record is Warwick International Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Flintshire, reference 51924.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJul 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-11-14.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

8.500 MW
Registered Capacity

πŸ“‹ Project Overview

Warwick International Biomass CHP is a 8.5 MW bioenergy / waste project in Wales. The applicant or operator on record is Warwick International Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Flintshire, reference 51924.

πŸ”§ Technical Specifications

Capacity (MW)8.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWarwick International Ltd
Owner / operatorWarwick International Ltd
Year consented2014
LocationCoast Rd, Holywell, Mostyn, Clwyd, CH8 9HE
RegionWales
Coordinates53.3147243Β°N, 3.2599387Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2014-04-01
2014-07-28