π Project Overview
Warrington Vehicle Centre, Hardwick Grange - Solar Panels is a 0.7 MW solar farm project in North West. The applicant or operator on record is European Tyre Enterprise Limited. Planning permission has been granted as of June 2024 and it is awaiting construction. The determining authority is Warrington, reference 2024/00625/PA14J.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 1 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | European Tyre Enterprise Limited |
| Owner / operator | European Tyre Enterprise Limited |
| Year consented | 2024 |
| Location | 2 Hardwick Grange, Woolston, Warrington, Cheshire, WA1 4RF |
| Region | North West |
| Coordinates | 53.403541Β°N, 2.5269095Β°W |