Land At Warren Farm Dunsville Doncaster, South Yorkshire, DN7 4BT
Warren Farm Solar Farm & Battery Storage is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Enso Green Holdings I Limited. Planning permission has been granted as of March 2022 and it is awaiting construction. The determining authorityβ¦
Consented / Approved
Project stageConsented
PlanningAug 2021 (completed)
ConsentedMar 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-02-16.
Registered planning capacity; not measured generation.
Warren Farm Solar Farm & Battery Storage is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Enso Green Holdings I Limited. Planning permission has been granted as of March 2022 and it is awaiting construction. The determining authority is Doncaster, reference 21/02567/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Enso Green Holdings I Limited
Owner / operator
Enso Green Holdings I Limited
Year consented
2022
Location
Land At Warren Farm Dunsville Doncaster, South Yorkshire, DN7 4BT