πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Bioenergy / Waste

Warmwell

Warmwell Quarry, Dorset

Warmwell is a 2 MW bioenergy / waste project in South West. The applicant or operator on record is Viridor. The application has been withdrawn or the scheme abandoned. The determining authority is Dorset, reference 1/E/2005/0155.…

Withdrawn
Project stageWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2011-03-03.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.000 MW
Registered Capacity

πŸ“‹ Project Overview

Warmwell is a 2 MW bioenergy / waste project in South West. The applicant or operator on record is Viridor. The application has been withdrawn or the scheme abandoned. The determining authority is Dorset, reference 1/E/2005/0155.

πŸ”§ Technical Specifications

Capacity (MW)2.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperViridor
Owner / operatorViridor
LocationWarmwell Quarry, Dorset
RegionSouth West
Coordinates50.6686468Β°N, 2.3480434Β°W

Additional published register fields

Registered technologyLandfill Gas