Wardley (Waste AD) is a 3 MW bioenergy / waste project in North East. The applicant or operator on record is Biogen (formerly Tamar Energy). The application has been withdrawn or the scheme abandoned. The determining authority is South Tyneside, reference ST/0995/13/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2019-09-04.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.000 MW
Registered Capacity

πŸ“‹ Project Overview

Wardley (Waste AD) is a 3 MW bioenergy / waste project in North East. The applicant or operator on record is Biogen (formerly Tamar Energy). The application has been withdrawn or the scheme abandoned. The determining authority is South Tyneside, reference ST/0995/13/FUL.

πŸ”§ Technical Specifications

Capacity (MW)3.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBiogen (formerly Tamar Energy)
Owner / operatorBiogen (formerly Tamar Energy)
Year consented2014
LocationWardley Colliery, Wardley Lane, Felling, Gateshead, Tyne and Wear, NE10 8YE
RegionNorth East
Coordinates54.9396371Β°N, 1.5123329Β°W

Additional published register fields

Registered technologyAnaerobic Digestion

πŸ“… Project Timeline

2013-09-03
2014-12-01