Consented / Approved
Project stageConsented
  1. PlanningJul 2024 (completed)
  2. ConsentedJul 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-07-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.180 MW
Registered Capacity

πŸ“‹ Project Overview

Wallingford AD Plant, Benson Lane - Solar panels is a 0.18 MW solar farm project in South East. The applicant or operator on record is Severn Trent Green Power Limited. Planning permission has been granted as of July 2025 and it is awaiting construction. The determining authority is South Oxfordshire, reference MW.0074/24.

Site Schematic

SUBSTATION ? ha Β· 0.18 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.180 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSevern Trent Green Power Limited
Owner / operatorSevern Trent Green Power Limited
Year consented2025
LocationWallingford AD Plant, Benson Lane, Oxfordshire, OX10 6SQ
RegionSouth East